Alder Shaft
Flooded excavated shaft with Montage and Portland Storage Co in background
Opera Shaft
Conveyor positioning over river
Opera Shaft
Diver looking out of decompression chamber
Opera Shaft
The cutterhead of "Rosie" the TBM gets christened with the project team
Opera Shaft
Close up overview with front shield and workers
East Side CSO tunnel
View of northbound tunnel with inspector
Steel Bridge Shaft site
Microtunnel Boring Machine (MTBM) under assembly
Opera Shaft
Tunnel Boring Machine (TBM) front shield underside showing push rams and hydraulic lines
Opera Shaft
West side of TBM front and tail shield & Bowflex seal before start of tunneling
Opera Shaft
Clam exiting shaft
Opera Shaft
Workers examing hydromill teeth
Outfall 40
Microtunnel Boring Machine (MTBM) suspended over shaft
Outfall 46 breakthrough
Group shot of workers when MTBM broke through at Outfall 46
Outfall 28 (SE 18th and Insley)
Opera Shaft Groundbreaking
Opera Shaft overview
Alder Shaft
Slurry separation plant workers
Tunnel Segments
Rosie the TBM comes to the surface
Cutterhead Removal
The TBM Cutterhead is removed from the McLoughlin Shaft
Tunneling Complete
Rosie the TBM Inside McLoughlin Shaft prior to cutterhead removal
East Side CSO Tunnel Complete
Looking Northbound