|
| Alder Shaft |
| Flooded excavated shaft with Montage and Portland Storage Co in background |
|
|
|
|
|
| Opera Shaft |
| The cutterhead of "Rosie" the TBM gets christened with the project team |
|
|
| Opera Shaft |
| Close up overview with front shield and workers |
|
|
|
|
|
| Opera Shaft |
| Tunnel Boring Machine (TBM) front shield underside showing push rams and hydraulic lines |
|
|
| Opera Shaft |
| West side of TBM front and tail shield & Bowflex seal before start of tunneling |
|
|
|
|
|
| Outfall 40 |
| Microtunnel Boring Machine (MTBM) suspended over shaft |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |