|
|
|
|
|
|
|
|
|
|
| Design Review |
| Required for some projects in the ‘d’ Design overlay zone. |
|
|
| Environmental Review |
| Required for proposals in the Environmental Conservation ‘c’ or Environmental Protection ‘p’ overlay zones that do not meet environmental standards. |
|
|
|
|
| Historic Review |
| Allows for review of alterations to existing historic resources and review of new development within designated districts. |
|
|
|
|
| Marquam Hill Parking Review |
| Allows for parking within the institutionally developed portions of Marquam Hill in a manner consistent with the goals and objectives of the Marquam Hill Plan. |
|
|
|
|
| Nonconforming Review |
| Determination of Legal Nonconforming Status Review and Nonconforming Situation Review |
|
|
| North Cully Development Review |
| To ensure that certain large parcels in the Cully Neighborhood are developed in a cohesive manner, compatible with the neighborhood to the south. |
|
|
|
|
| Tree Review |
| Required to allow tree removal in some areas, to change tree preservation mitigation methods for a land division, or for some corrections to violations of tree protection and tree preservation regulations. |
|
|
|
|
| Zoning Changes |
| Required to change the zoning on the site if the proposed zoning is in compliance with the Comprehensive Plan designation. If a different zone is requested, a Comprehensive Plan Map Amendment Review is also required. |
|
|