|
Greenway Review is required for many projects that occur within the Greenway overlay zones (“n”, “r”, “g”, “i”, and “q” overlays). The Greenway Review is required to address issues of public access, flood protection, transportation connections, and potential impacts to recreational users, wildlife, and water quality.
Chapter 33.440 of the Portland Zoning Code includes the majority of the City’s Greenway regulations. South Waterfront Greenway Review is required for some projects within greenway area.
Greenway Review Procedures
Greenway reviews are processed using the Type II procedure.
Greenway Goal Exception is required to locate a development or right-of-way that is not river-dependent or river-related within or riverward of the greenway setback. Greenway Goal Exceptions are processed through the Type III procedure, require a Pre-Application Conference, and must be approved by the City Council (see Statewide Planning Goal Exceptions).
APPLICATION FORMS
HANDOUTS
FEE INFORMATION
|
|
|
|
|
|
|
|
|
|
|
| Design Review |
| Required for some projects in the ‘d’ Design overlay zone. |
|
|
| Environmental Review |
| Required for proposals in the Environmental Conservation ‘c’ or Environmental Protection ‘p’ overlay zones that do not meet environmental standards. |
|
|
|
|
| Historic Review |
| Allows for review of alterations to existing historic resources and review of new development within designated districts. |
|
|
|
|
| Marquam Hill Parking Review |
| Allows for parking within the institutionally developed portions of Marquam Hill in a manner consistent with the goals and objectives of the Marquam Hill Plan. |
|
|
|
|
| Nonconforming Review |
| Determination of Legal Nonconforming Status Review and Nonconforming Situation Review |
|
|
| North Cully Development Review |
| To ensure that certain large parcels in the Cully Neighborhood are developed in a cohesive manner, compatible with the neighborhood to the south. |
|
|
|
|
| Tree Review |
| Required to allow tree removal in some areas, to change tree preservation mitigation methods for a land division, or for some corrections to violations of tree protection and tree preservation regulations. |
|
|
|
|
| Zoning Changes |
| Required to change the zoning on the site if the proposed zoning is in compliance with the Comprehensive Plan designation. If a different zone is requested, a Comprehensive Plan Map Amendment Review is also required. |
|
|
| |