PortlandOnline

POL Government Bureaus & Offices Development Services Information Center BDS BLOG BDS Blog Archived 2008 BDS Blog Articles September 2008
New Moisture Control Requirements - Printable Version - September 17, 2008 - 0 Comments

The 2008 edition of the Oregon Residential Specialty Code [ORSC] contains new code language that requires contractors to provide written documentation of compliance with two new regulations. The new requirements are related to moisture control in wood construction and high efficiency interior lighting systems as follows:

 

Residential constructionMoisture Control

ORSC Section R318.2. Prior to the installation of interior finishes, the building official shall be notified in writing by the general contractor that all moisture-sensitive wood framing members used in construction have a moisture content of not more than 19 percent of the weight of dry wood framing members.

 

High-Efficiency Interior Lighting Systems

ORSC Section N1107.2. A minimum of fifty (50) percent of the permanently installed lighting fixtures shall be installed with compact or linear fluorescent, or a lighting source that has a minimum efficacy of 40 lumens per input watt. Screwin compact fluorescent lamps comply with this requirement.

 

The building official shall be notified in writing at the final inspection that a minimum of fifty percent of the permanently installed lighting fixtures are compact or linear fluorescent, or a minimum efficacy of 40 lumens per input watt.

 

The Bureau of Development Services will provide standard forms that must be completed and provided on the job site at the time of inspection. Documentation of wood framing moisture content will be required prior to approval of insulation/wall cover. Documentation of high efficiency interior lighting systems will be required prior to final inspection approval. BDS inspectors will collect the forms to be filed as part of the inspection record.

 

The new requirements apply to all projects reviewed under the 2008 ORSC. Please contact Jim Nicks, BDS Residential Inspections Manager, at (503) 823-1054 if you have any questions about these new requirements.

 



Comments

Please review our Code of Conduct rules before posting a comment to this site. Report Abuse, please include specific topic and comment for the fastest response/resolution.

Post a Comment
Name
E-mail (visible to admins only)
 Remember Info Yes   No
Comments
Spam Prevention
In order to prevent blog spam from automated scripts,
please answer the following question.
In the Pacific Northwest, what state is Portland in? 
 
Table of Contents
BDS Employee Wins the 2008 Youth Champion Award
Big Brothers Big Sister Big BDS Support
Economic slowdown settles into town
Continuing with the Latino/Latina American Heritage Celebration
BDS hoping to ease technology transition
2008 IAEI Northwestern Annual Meeting was a success
Announcing New Topics for Speakers Program
2008 Home Improvement & Remodeling Show
Video Clip: Latino/Latina American Heritage Celebration
The Great Green & Local Chili Cook-off results
Bureau of Development Services Launches Strategic Planning Process
BDS Summer Internship Final Days
New BDS Strategic Plan website
New Moisture Control Requirements
City could take a mulligan on golf course rezoning
The 2008 Build It Green Fair
A green alternative to portable classrooms
BDS concluded their Spring 2008 Landlord Training Program
Latino/Latina American Heritage Celebration
Portland in top 10 for sustainability
Field Issuance Remodel Program
LEED changes with the times
Fine Homebuilding features Living Smart design
Plans Examiner Bi-Monthly Latest Edition (September/October 2008)