SITE DEVELOPMENT FEE SCHEDULE - COMMERCIAL, RESIDENTIAL AND SITE DEVELOPMENT PROJECTS
Binding City Policy
BCP-ENB-14.09
Effective Date: July 1, 2012
|
APPLIES TO COMMERCIAL, DEVELOPMENT REVIEW AND SITE DEVELOPMENT PROJECTS:
|
|
Commercial Site Review Fee
|
|
Applies to commercial building, development review and site development
permits requiring site development review. Includes sites located in or
adjacent to flood hazard areas and liquefaction hazard areas, sites with
steep slopes, and projects with non-prescriptive geotechnical design.
Services include plan review for site conditions, flood, liquefaction and
steep slope hazards, and geotechnical review.
|
|
For Commerical Building, Development Review 15% of the permit fee
and, Site Development Permits: Minimum fee is $131
|
|
APPLIES TO RESIDENTIAL PROJECTS:
|
|
|
Residential Fees
|
|
|
Residential Site Review and Inspection Fee for
Simple Sites:
|
|
|
Applies to all simple residential sites with ground-disturbing activity.
Services include plan review and/or inspections for site conditions,
geotechnical review, landscaping, zoning, erosion control, and
compliance with conditions of Land Use Reviews.
|
| |
|
|
|
New Construction
|
$525
|
|
Additions, alterations, garages, and carports
|
$219
|
|
Decks, fences and demolitions
|
$160
|
|
|
Residential Site Review and Inspection Fee for Complex Sites:
|
|
|
Applies to residential sites with ground-disturbing activity located in
special sites, as defined in Title 10. Services include plan review
and/or inspections for site conditions, geotechnical review, landscaping,
zoning, Environmental Zone standards, erosion control, and compliance
with conditions of Land Use Reviews.
|
| |
| |
|
New Construction
|
$690
|
|
Additions, alterations, garages, and carports
|
$345
|
|
Decks, fences and demolitions
|
$239
|
|
APPLIES TO COMMERCIAL, DEVELOPMENT REVIEW and SITE DEVELOPMENT PROJECTS:
|
|
| |
|
|
Erosion Control Fees
|
|
|
Commercial, Development Review and Site Development Permits:
|
|
|
Located in an Environmental Zone:
|
Base fee (up to one acre) $592
plus, $66 for each 0.5 acre (21,780 sq. ft.)
of lot area, or portion thereof, for lots over
1 acre (43,560 sq. ft.)
|
|
|
|
|
Located in any other zone:
|
Base fee (up to one acre) $396
plus, $66 for each 0.5 acre (21,780 sq. ft.)
of lot area, or portion thereof, for lots over
1 acre (43,560 sq. ft.)
|
|
|
|
|
Exterior Utility Lines (water, sanitary, storm,
telephone, cable, electric)
|
$35 for the first 100 feet of line.
$26 for each additional 100 feet of line,
or portion thereof.
|
|
|
|
|
Exterior Alterations and Additions
|
|
|
Located in an Environmental Zone:
|
Base fee (up to one acre) $231 plus
$38 for each 0.5 acre (21,780 sq. ft.)
of ground disturbance, or portion thereof,
for projects disturbing more than 1 acre
(43,560 sq. ft.)
|
|
|
|
|
Located in any other zone:
|
Base fee (up to one acre) $153 plus
$38 for each 0.5 acre (21,780 sq. ft.)
of ground disturbance, or portion thereof,
for projects disturbing more than 1 acre
(43,560 sq. ft.)
|
|
|
|
|
APPLIES TO COMMERCIAL, RESIDENTIAL AND SITE DEVELOPMENT PROJECTS:
|
|
Clearing Fee
|
|
|
For vegetation removal only with no other permitted activity.
|
|
5,000 square feet to 1 acre
|
$90
|
|
Over 1 acre
|
$90 plus $16 per additional acre or fraction
of an acre.
|
|
|
Clearing with Tree Cutting Fee
|
|
|
For vegetation removal only with no other permitted activity.
|
|
(on slopes over 10% gradient)
|
|
|
2,500 square feet - 1 acre
|
$130
|
|
1 acre and up
|
$130 plus $44 per additional acre or
fraction of an acre.
|
APPLIES TO SITE DEVELOPMENT PERMITS ONLY:
|
|
Site Development Permit Fee
|
|
|
Applies to site work when no building permit is issued, including grading,
excavation, private streets, and landscaping. Site development permit
fees use the standard building permit fee table based upon project
valuation, plus a plan review fee of 65% of the site development permit fee.
|
| |
| |
|
|
|
|
Total Value of Construction Work to be Performed:
|
|
|
$1 - $500
|
$95.00 minimum fee
Maximum number of allowable* inspections: 2
|
|
$501 - $2,000
|
$95.00 for the first $500, plus $2.44 for each
additional $100 or fraction thereof, to and
including $2,000
Maximum number of allowable* inspections: 2
|
|
$2,001 - $25,000
|
$131.60 for the first $2,000, plus $9.54 for each additional $1,000 or fraction thereof, to and
including $25,000
Maximum number of allowable* inspections: 5
|
|
$25,001 - $50,000
|
$351.02 for the first $25,000, plus $7.02 for each additional $1,000 or fraction thereof, to and including $50,000
Maximum number of allowable* inspections: 6
|
|
$50,001 - $100,000
|
$526.52 for the first $50,000, plus $4.65 for each additional $1,000 or fraction thereof, to and including $100,000
Maximum number of allowable* inspections: 7
|
|
$100,001 and up
|
$759.02 for the first $100,000, plus $3.83 for each additional $1,000 or fraction thereof
|
|
*Inspections exceeding the maximum number of allowable shall be charged
at the Reinspection Fee rate of $97 per inspection.
|
|
|
Site Development Plan Review Fee
|
|
|
For the original submittal:
|
65% of the permit fee
Maximum number of allowable checksheets: 2
Any additional checksheets will be charged
at the rate of $175 per checksheet.
|
|
For value-added revisions:
|
65% of the additional permit fee
(based on the additional valuation)
|
|
For all other revisions:
|
Plan review time 1/2 hour or less: $71
Plan review time greater than 1/2 hour:
$142 per hour or fraction thereof
|
|
APPLIES TO COMMERCIAL, RESIDENTIAL, DEVELOPMENT REVIEW and SITE DEVELOPMENT PROJECTS:
|
|
Miscellaneous Fees
|
|
|
Additional Plan Review Fee
|
|
|
For changes, additions, or revisions to approved plans.
|
Plan review time 1/2 hour or less: $71
Plan review time greater than 1/2 hour:
$142 per hour or fraction thereof
|
|
For technical plan review of special sites, including grading, geotech, engineered stormwater facilities, shoring, and private streets.
|
|
|
|
Inspections Outside of Normal Business Hours
|
$194 per hour or fraction of an hour
Minimum - $194
|
|
|
Investigation Fee
|
|
|
For commencement of work before obtaining a permit
|
Equal to the permit fee
|
|
|
Limited Site Development Consultation Fee
|
|
|
For requested optional meeting or site visit held
prior to permit application. Applies to projects
with complex site issues, including geotech, environmental zones, or other special sites.
|
$284
|
|
The meeting will be limited to two City staff
members. Fee for each additional staff in
attendance.
|
$152
|
|
|
Other Inspections Not Specifically Identified Elsewhere
|
$142 per hour or fraction of hour
Minimum - $142
|
|
|
|
|
Permit Reinstatement Processing Fee
|
|
|
Fee for renewal of a permit that has been expired for
six months or less provided no changes have been
made in the original plans and specifications for such
work. A permit may be renewed only once.
|
The renewal fee shall be one half the amount
required for a new permit.
Minimum Fee - $95
|
|
|
Reinspection Fee
|
|
|
When another inspection is required to confirm
corrections, when the site is not accessible for a
requested inspection, or plans are not available
on site as required.
|
$97 per inspection
|
HISTORY
Ordinance No. 176981, passed by City Council October 16, 2002 and effective November 15, 2002.
Filed for inclusion in PPD September 29, 2004.
Amended by Ordinance No. 180190, passed by City Council May 31, 2006 and effective July 1, 2006.
Amended by Ordinance No. 181007, passed by City Council May 31, 2007 and effective July 1, 2007.
Amended by Ordinance No. 181834, passed by City Council May 14, 2008 and effective July 1, 2008.
Amended by Ordinance No. 182842, passed by City Council May 27, 2009 and effective July 1, 2009.
Amended by Ordinance No. 183556, passed by City Council February 24, 2010 and effective April 1, 2010.
Amended by Ordinance No. 183831, passed by City Council May 26, 2010 and effective July 1, 2010.
Amended by Ordinance No. 184624, passed by City Council May 25, 2011 and effective June 24, 2011.
Amended by Ordinance No. 185373, passed by City Council May 30, 2012 and effective June 29, 2012.
|