SEWER DEVELOPMENT SERVICES PROGRAMS
Administrative Rule Adopted by Bureau of Environmental Services Pursuant to Rule-Making Authority
ARB-ENB-4.07

 

TABLE OF CONTENTS

 

1.  Applicability

2.  Purpose

3.  Regulatory Authority

4.  Route of Service

5.  Sewer Connection Requirements

6.  Sewer Repair when Existing Connection is Not Preferred Route of Service

7.  Connections to Existing Manholes

8.  Building Plan Review

9.  Public Works Permits

10.  Easement Encroachment

 

 

1.  Applicability

 

All persons wishing to extend, connect to or otherwise use City sewer services must comply with the requirements of these rules.

 

2.  Purpose

 

The purpose of the Sewer Development Services Programs administrative rules is to ensure the clear and concise application of the Portland City Code (PCC) and to formalize existing policies and practices related to permit requirements, permit review, sewer charges and the provision of sewer service.

 

3.  Regulatory Authority

 

A.  PCC Chapters 17.24 and 17.32 establish authority for permitting connection to the sewer system and for the Director of the Bureau of Environmental Services (BES).

 

B.  PCC 3.13 establishes the authority for the Director of BES to create administrative rules related to BES program such as approving connections to the public sewer system.

 

C.  PCC 17.36.070 establishes the authority to collect charges for connection and use of City sewers.

 

These rules use the definitions found in PCC 17.32.006

 

4.  Route of Service

 

Properties should be connected to the sewer by the most direct route possible that will provide unobstructed gravity service. In identifying the appropriate route of service, staff will make the decision based on the following criteria:

 

A.  Depth. Gravity service is preferred. Each lot must have individual gravity connections to a public sanitary sewer as approved by BES. Pumped connections require written approval from BES and the Bureau of Development Services (BDS).

 

B.  Connection routes.

 

1.  New connections or sewer extensions should not conflict with anticipated, future connection needs per adopted comprehensive planning and zoning documents, and existing underdeveloped land. Allocation of capacity is, however, on a first come, first served basis.

 

2.  Private laterals must not cross other private properties unless no other route of service is possible and the public sewer cannot be extended. If a public sewer extension is not possible, construction across adjoining properties with permission from the affected property owners in the form of easements may be approved.

 

C.  Future maintenance access to the City system. Connections must comply with the Sewer and Drainage Facilities Design Manual and plumbing rules for construction requirements and required clearance distances.

 

D.  Length of pipe. Sewer branches should not exceed 100 feet if possible. The Sewer and Drainage Facilities Design Manual and the Oregon Plumbing Specialty Code should be consulted when long branches cannot be avoided.

 

E.  Slope. A sewer line with a slope less than the minimum required grade and proposals to install private pump systems must be approved by BDS and BES. BDS and BES will consider the length of pipe, the amount of flow expected in the pipe, soil and site conditions, and installation method.

 

F.   Private sewer lines. Lines running parallel to City right of way will be avoided if possible. Private routes of connection through adjacent properties will not be allowed if a route of service is available in the right of way that can provide a gravity connection.

 

5.  Sewer Connection

 

A.  Applicability. Sewer connection permits are required for:

 

1.  Sewer repairs in City right of way;

2.  Connections to the City sewer main and laterals;

3.  Relocations of existing laterals;

4.  Connections to existing laterals extended to private property; and

5.  Construction or extension of branches to private property for future use.

 

B.  Authorized Persons. Sewer connection permits must be obtained and sewer connections installed by:

 

1.  The legal owner of the property;

2.  A plumbing contractor, licensed and registered with the state ofOregon and the City of Portland;

3.  A sewer contractor, licensed and registered with the state ofOregon and the City of Portland; or

4.  A general contractor, licensed and registered with the state ofOregon and the City of Portland

 

C.  Requirements. Sewer connections must meet the technical standards from:

 

1.  The most recent Sewer and Drainage Facilities Design Manual and the Stormwater Management Manual;

2.  The City's Standard Construction Specifications; and

3.  The PCC.

 

a.  Stormwater discharge to sanitary systems. Only the following exceptions are made to the requirements of PCC Section 17.32.90 regarding connections of stormwater to sanitary only systems:

 

i.  Residential roof drains are allowed to be connected to sanitary only systems when there is a potential for landslide or other safety or environmental hazard and when the system ultimately discharges to a combined sewer collection system. Residential drains to sanitary only pipes with direct link to the City’s treatment plants are prohibited.

 

4.  Sewer Location. The permittee is responsible for verifying location and depth of existing branches and verifying that the branch is clear of obstructions before connecting to the sewer branch. If there is a problem with locating the branch as described on a sewer connection permit, costs associated with laying of line without first physically confirming the location of the branch will be borne by the permit holder.

 

These documents are available at the Development Services Building (1900 SW 4th).

 

D.  Deviations. Any deviations from requirements must be requested in writing. All requests will be reviewed within ten days of the received date by BES. Appeals to requirements of these rules can be made by using the process as described in PCC 17.16 and the Stormwater Management Manual.

 

6.  Sewer Repair when Existing Connection is Not Preferred Route of Service

 

If an existing connection is in need of repair and a direct, gravity connection is available; a new connection along a more direct route will be required rather than a repair. Properties will be required to make a direct, separate connection to the sewer if and when a shared connection (a.k.a. party connection) fails or needs repair. There may be some instances where this may not be feasible and an exception will be approved. Examples are:

 

A.  Buildings are so close together that it is impossible to lay a second line between them without causing risk to existing structures or violating other building codes.

 

B.  The shared line crosses a major arterial or state highway or has an obstruction that prevents a feasible change in route of service.

 

7.  Connections to Existing Manholes

 

Connections to existing sewers should be done in accordance with technical requirements as written in the Sewer and Drainage Facilities Design Manual and on the connection permit.

 

A.  Drop Connections. Written approval must be obtained from BES for inside drop connections to manholes. The following conditions must exist for BES to permit an inside drop.

 

1.  Minimum depth for the main sewer must be 15 feet for an inside drop connection.

2.  No other inside drop structure can exist in the manhole.

 

8.  Building Plan Reviews

 

BES reviews building permits for availability of public sanitary sewer services, route of service, the adequacy of stormwater management proposals and compliance with the Stormwater Management Manual. BES staff reviews all residential and commercial building permits and tenant improvement permits that represent a change of use or an increased demand on sanitary and stormwater discharges.

 

A.  Permit Issuance. Permits will not be issued until the sewer lines have been released by the appropriate project manager for the sewer installation project and all related public works fees have been paid, unless an exception has been authorized in writing from Development Services Manager.

 

9.  Public Works Permit

 

A.  Applicability. Public Works Permits are to allow an applicant to construct a sanitary or stormwater facility that will eventually be conveyed to the City. All permit conditions must be satisfied and the warranty period (typically two years) expired to convey responsibility to the City (BES) for maintenance.

 

1.  Public Sewer Extension Required. The applicant must extend a public sewer to the developing property if a public sewer is within 300 feet of the developing property and when future needs justify it. A public sewer easement through an adjacent lot will be required unless site conditions would offset the advantage of the public sewer extension and BES agrees a private sewer and easement are more appropriate.

 

B.  Authorized Persons. Public Works Permits are issued by BES to the party who either owns the property to be served or a developer or contractor who is authorized by the owner to cause construction of the improvements. The contractor is the party responsible for completing the work provided for under the permit. Regardless of which party signs the permit, both the applicant and the contractor are subject to its terms and must jointly assure that its requirements are satisfied.

 

C.  Public Facilities Required. If an existing City right-of-way (ROW) or newly designated ROW is being improved to City standards, any new facility receiving flow from that improvement must be built to meet BES public facility standards. Public facilities must be either built as part of a Capital Improvement Project or reviewed under some form of Public Works Permit. All public facility designs must be reviewed and accepted by the BES Chief Engineer.

 

1.  The permittee must ensure that the public facility has been engineered to address the drainage of the site and any drainage through the site before BES will accept it. All plans for public facilities or facilities that are being permitted to become public, must be engineered and stamped by an engineer and the final design plans must be routed to the BES Chief Engineer. The Chief Engineer needs sufficient information to assure that the final plans have been appropriately reviewed to meet or exceed current:

 

a.  Engineering design specifications;

b.  Constructability needs;

c.  Maintenance standards;

d.  Environmental regulations; and

e.  Permit conditions.

 

Street plans with inlet leads must be on the Bureau of Transportation (PBOT) set of plans, not the BES set of plans, and be signed by the PBOT City Engineer.

 

2.  If a private stormwater facility has been allowed to encroach in the ROW by exception and with an encroachment permit, the facility must be designed and stamped by an engineer. The encroachment agreement will include a maintenance obligation for the private property owner. Incidental runoff from a sidewalk into a private facility does not necessarily require that facility become a public facility, but should be avoided whenever possible. The types of facilities that may currently accepted in the ROW are defined in the Sewer and Drainage Facilities Design and Stormwater Management manuals.

 

D.  Public Facility Review. Public facilities are reviewed against the criteria and performance standards that are defined in the BES Sewer and Drainage Facilities Design Manual and the Stormwater Management Manual. Engineering calculations for sizing, depth and other attributes are checked to ensure that they provide adequate volume for the specific storm and the drainage area to be served. Appropriate overflow and disposal locations are checked against the stormwater disposal hierarchy and other standards as described in the appropriate administrative rules and technical manuals. Constructability and maintenance issues will be verified through plan review with appropriately assigned BES staff.

 

E.  Types of Public Works (PW) Permits.

 

1.  BES Public Works permit. This process is managed by the Development Engineering/Systems Development Section and is used for any stormwater or sanitary facility that is being built in an improved ROW or public easement to manage street run-off and/or sanitary flow. Developers submit design plans to Development Engineering for review against the standards in the Sewer and Drainage Facilities Design and Stormwater Management Manuals. The developer controls the contractor and pays for BES inspection and plan review. For small sanitary sewer extensions, an applicant may request and pay for a BES design engineer to provide the facility design.

 

2.  Joint PBOT/BES Permit. BES Development Engineering and PBOT jointly review plan submittals. This process is used when there is a developer-initiated permit for a street improvement that includes a stormwater facility that is receiving run-off from a street improvement. Timing and scheduling of the two components need to be coordinated to assure this joint review process is possible.

 

10.  Easement Encroachment

 

Sewer easements are exclusive. No other utilities or structures are allowed within them that could inhibit access to the sewer unless, in the judgment of BES no alternative exists for locating a required use. Staff will balance the need for the encroachment against the repair and maintenance needs of that sewer. Decisions can be appealed through the process defined in City Code and the Stormwater Management Manual. If an encroachment into the ROW is approved, an encroachment permit will be required.

 

 
PDF Documents for download:
 
 

HISTORY
 
Filed for inclusion in PPD September 30, 2004.
Signed by Environmental Services Director September 30, 2004.
Amended by Bureau of Environmental Services Director June 11, 2012.

Table of Contents
ENB-4.01 - Stormwater Management Manual
ENB-4.02 - Sewer Maintenance Under Streetcar Tracks
ENB-4.03 - Sanitary Discharge and Pretreatment Program Administrative Rules
ENB-4.04 - Odor Control Policy for Columbia Boulevard Wastewater Treatment Plant
ENB-4.05 - System Development Charges Administrative Rules
ENB-4.06 - Sanitary Sewer Line and Branch Connection Charges
ENB-4.07 - Sewer Development Services Programs
ENB-4.08 - BES Sewer Backflow Device Reimbursement Program Administrative Rules
ENB-4.09 - Sewer and Drainage System User Charges Administrative Rules
ENB-4.10 - Erosion and Sediment Control Manual
ENB-4.11 - Recovering the Costs of Engineering and Superintendence Services for Public Sewer Improvement Projects
ENB-4.12 - Septage Hauler Program Administrative Rules
ENB-4.13 - Administrative Rules for Discharges to the City Storm Sewer and Drainage System
ENB-4.14 - Sewer and Drainage Facilities Design Manual
ENB-4.15 - BES Enforcement Program Administrative Rules
ENB-4.16 - Clean River Rewards Stormwater Discount Program
ENB-4.17 - Sanitary System Connection Administrative Rules
ENB-4.18 - Mandatory Sewer Connection Program
ENB-4.19 - Green Streets Policy and Green Streets Cross-Bureau Phase 2 Report
ENB-4.20 - Sewer and Drainage Rates and Charges
ENB-4.21 - Downspout Disconnection Program
ENB-4.22 - BES Public Works Enforcement Program Administrative Rules
ENB-4.23 - Treebate Program
ENB-4.24 - Public Works Permitting Services and Fees
ENB-4.25 - Extra Strength Charge Program Administrative Rules
ENB-4.26 - Fats, Oils, and Grease Removal Program Administrative Rules
ENB-4.27 - Nonconforming Sewer Conversion Program
ENB-4.28 - BES Financial Assistance Programs
ENB-4.29 - BES Connection Permit Refund Administrative Rules
ENB-4.30 - BES Title 10 Discharge Enforcement Administrative Rules
ENB-4.31 - Maintenance Inspection Program Administrative Rules
See Also Erosion Control Plan Review and Inspection Requirements
See Also Private Sewers in the Public Right-of-Way
See Also Watershed Health