PortlandOnline

POL Government Elected Officials Auditor Griffin-Valade Charter, Code & Policies City Code & Charter Online Code & Charter Title 17 Public Improveme Chapter 17.56 Public Utilitites
17.56.020 Plans for Underground Construction by Franchise Holder.

(Amended by Ordinance Nos. 151100, 176555 and 184957, effective November 25, 2011.)  Any person conducting a business within the City under a City franchise or permit, giving to such person the right to construct underground conduits or to lay pipes underground, shall, before entering upon any street for the purpose of cutting into, digging trenches in, or opening any street preparatory to the construction of any conduit or to the laying of any pipes, wires, or cables, file with the Director of the Bureau of Transportation detailed plans and specifications of all the proposed construction work.  Such plans shall be drawn to a scale prescribed by the Director of the Bureau of Transportation and such specifications shall state the manner of construction and the kind of materials proposed to be used.  If the plans and specifications are satisfactory to the City Engineer, the Director of the Bureau of Transportation shall issue a permit to the person filing them to construct the work.  If the City Engineer does not approve the plans or specifications or orders changes made therein, the person submitting them shall comply with the City Engineer’s requirements and shall file new plans and specifications which are satisfactory to the City Engineer.  If these are approved by him or her, the person may then obtain a permit and proceed with the construction of the work.  If in the performance of the work it becomes necessary to deviate from such plans and specifications, deviation shall not be made until first approved by the City Engineer.

Upon completion of the construction for which a permit has been issued, a map showing the location at depths below the surface of the ground of all construction work done under the permit shall be filed with the Director of the Bureau of Transportation.  If changes have been made after the permit is issued, these changes shall be shown in an easily distinguishable manner.  The final map shall bear a statement to the effect that the work done under the permit is correctly shown, and shall be signed by an authorized representative of the company doing the work.

The provisions of this Section shall apply both to dedicated right-of-way and to proposed right-of-way in approved land divisions which will be dedicated to the public upon plat recording.  Permits issued for underground construction in proposed right-of-way shall require acknowledgment that the permittee will hold the City of Portland harmless against any liability which may occur prior to dedication of the right-of-way, and further acknowledgment that the permittee assumes all risk of loss which may arise in the event the City or any other public agency subsequently requires changes in or additions to plans or refuses to approve all or any part of permittee’s improvements.  Permits shall be issued only after street improvement plans have been approved.

 


Title 17 Public Improveme
Chapter 17.04 Definitions
Chapter 17.06 Administration of Public Works Permitting
Chapter 17.08 Local Improvement Procedure
Chapter 17.12 Assessments
Chapter 17.13 Parks and Recreation System Development Charge
Chapter 17.14 Financing Systems Development Charges
Chapter 17.15 Transportation System Development Charge
Chapter 17.16 General Provisions
Chapter 17.18 General Obligation Improvement Warrants
Chapter 17.19 Northwest Transportation Fund
Chapter 17.20 (Repealed)
Chapter 17.23 Special Traffic Control District
Chapter 17.24 Permits
Chapter 17.25 Sidewalk Cafes
Chapter 17.26 Sidewalk Vendors
Chapter 17.27 Structural Driveways
Chapter 17.28 Sidewalks, Curbs and Driveways
Chapter 17.30 (Repealed)
Chapter 17.32 Public Sewer and Drainage System Permits, Connections and Maintenance
Chapter 17.33 Required Public Sewer Connection
Chapter 17.34 Sanitary Discharges
Chapter 17.35 Septage Discharge
Chapter 17.36 Sewer User Charges
Chapter 17.37 Downspout Disconnection
Chapter 17.38 Drainage and Water Quality
Chapter 17.39 Storm System Discharges
Chapter 17.40 Protection of Public Right-of-Way
Chapter 17.41 Landslide Abatement
Chapter 17.42 Property Owner Responsibility for Streets
Chapter 17.44 Street Obstructions
Chapter 17.45 Advertising on Bus Benches
Chapter 17.46 Newsracks
Chapter 17.48 Moving Buildings
Chapter 17.52 Trees
Chapter 17.56 Public Utilitites
Chapter 17.60 Underground Wiring Districts
Chapter 17.64 Protection of City Owned Telecommunications Line and Equipment, Street Lighing and Traffic Signal Systems
Chapter 17.68 Street Lights
Chapter 17.72 (Repealed)
Chapter 17.76 Fuel Tanks
Chapter 17.80 Plats and Dedications
Chapter 17.82 Land Divisions
Chapter 17.84 Street Vacations
Chapter 17.88 Street Access
Chapter 17.92 Street Designation
Chapter 17.93 Renaming City Streets
Chapter 17.96 Surveys, Elevations and Monuments
Chapter 17.100 Remedies and Penalties
Chapter 17.102 Solid Waste & Recycling Collection
Chapter 17.103 Single-Use Plastic Checkout Bags