PortlandOnline

POL Government Elected Officials Auditor Griffin-Valade Charter, Code & Policies City Code & Charter Online Code & Charter Title 17 Public Improveme Chapter 17.06 Administration of Public Works Permitting
17.06.050 Appeals.

(Amended by Ordinance No. 184707, effective July 29, 2011.)

 

A.  Unless prohibited by this Code and rules adopted by the Public Works Permit Manager, any person whose application for a Public Works Permit is denied or any person who is required pursuant to, or as a written condition of, the grant of a Public Works Permit to incur an expense for the alteration, repair, or construction of a facility in the public right of way, including but not limited to pavement, sidewalk areas, stormwater facilities or utilities may appeal to the Public Works Administrative Appeal Panel (PWAAP) by serving written notice upon the Public Works Permit Engineering Manager.  The following actions are not subject to appeal: 

 

1.  Approval or denial of requests for design exceptions;

 

2.  Previously established City  standards and specifications;

 

3.  Decisions related to the assessment of system development charges;

 

4.  Matters subject to the authority of any other City appeal body;

 

5.  Matters which may be appealed through City or state land use processes. 

 

B.  A permit decision, requirement or condition may only be appealed if it is in writing and only on the grounds that it is inconsistent with or contrary to City Code, rules, standards, policy, or is a misapplication or misinterpretation, thereof.

 

C.  An appellant shall serve written notice of appeal on the Public Works Permit Engineering Manager challenging an appealable permit decision, requirement, or condition. The notice of appeal shall be in such form as specified by the Public Works Permit Engineering Manager, and shall be accompanied by a fee, which shall be set on an annual basis by City Ordinance, and served within the time for appeal specified in Subsection H. of this Section.

 

D.  Content of the appeal.  The appeal must be submitted on forms provided by the Public Works Permit Engineering Manager.  All information requested on the form must be submitted.  The appeal request must include:

 

1.  The public works permit number appealed;

 

2.  The appellant's name, address, signature, phone number;

 

3.  The grounds for the appeal including, at a minimum, the specific City Code provision, rule, standard, or policy with which the decision, requirement, or condition is claimed to be in conflict and a detailed explanation of the alleged conflict;

 

4.  The relief requested; and

 

5.  The required fee.

 

E.  The PWAAP may approve, approve with conditions or deny the requested relief.  Any such decision must be consistent with applicable City Code, rules, standards and policies.  The decision of the PWAAP, including a statement of its basis, shall be transmitted to the appellant and the relevant Bureaus in writing.

 

F.  The appellant may appeal the PWAAP decision to the Public Works Board of Appeals (PWBA) by serving written notice on the Public Works Permit Engineering Manager.  Failure to do so shall constitute waiver of any objections to the decision.  The allowable grounds for appeal to the PWBA are as stated in Subsection B. of this Section.  The request for appeal to the PWBA must include all items as stated in Subsection D. of this Section, and must be made within the time for appeal specified in Subsection H. of this Section.

 

G.  The PWBA may approve, approve with conditions or deny the requested relief.  Any such decision made must be consistent with applicable City Code, rules, standards and policies.  If the PWBA determines that the requested relief cannot be granted without a change to City policy the PWBA may recommend such a change in writing to the Directors of the Bureaus of Transportation, Water, Environmental Services and Development Services and may incorporate the Directors’ response into its final decision.  The PWBA shall transmit to the appellant and the relevant Bureaus a written decision on the appeal, including a statement of its basis.

 

H.  Sequence of Appeals.  The purpose of the appeals procedures is to identify and resolve appealable issues as early as possible, and to ensure an appeal is fully resolved before an applicant moves to subsequent steps in the permit review process.  The following sequencing requirements apply to appeals:

 

1.  Appellant may file an appeal during any phase of the permit application and review process.  However, an appeal must be submitted during the phase in which the decision is made.  For example, a decision made during the 30 percent phase of plan review must be appealed prior to the start of the 60 percent phase. 

 

2.  The time required to file and process an appeal shall not increase the amount of time allowed by the City for an applicant to file and process a public works permit application. The right to appeal shall expire when the permit expires.

 

I.  Decisions of the PWBA are final. They may be reviewed by the Circuit Court pursuant to ORS 34.010 to 34.102.


Title 17 Public Improveme
Chapter 17.04 Definitions
Chapter 17.06 Administration of Public Works Permitting
Chapter 17.08 Local Improvement Procedure
Chapter 17.12 Assessments
Chapter 17.13 Parks and Recreation System Development Charge
Chapter 17.14 Financing Systems Development Charges
Chapter 17.15 Transportation System Development Charge
Chapter 17.16 General Provisions
Chapter 17.18 General Obligation Improvement Warrants
Chapter 17.19 Northwest Transportation Fund
Chapter 17.20 (Repealed)
Chapter 17.23 Special Traffic Control District
Chapter 17.24 Permits
Chapter 17.25 Sidewalk Cafes
Chapter 17.26 Sidewalk Vendors
Chapter 17.27 Structural Driveways
Chapter 17.28 Sidewalks, Curbs and Driveways
Chapter 17.30 (Repealed)
Chapter 17.32 Public Sewer and Drainage System Permits, Connections and Maintenance
Chapter 17.33 Required Public Sewer Connection
Chapter 17.34 Sanitary Discharges
Chapter 17.35 Septage Discharge
Chapter 17.36 Sewer User Charges
Chapter 17.37 Downspout Disconnection
Chapter 17.38 Drainage and Water Quality
Chapter 17.39 Storm System Discharges
Chapter 17.40 Protection of Public Right-of-Way
Chapter 17.41 Landslide Abatement
Chapter 17.42 Property Owner Responsibility for Streets
Chapter 17.44 Street Obstructions
Chapter 17.45 Advertising on Bus Benches
Chapter 17.46 Newsracks
Chapter 17.48 Moving Buildings
Chapter 17.52 Trees
Chapter 17.56 Public Utilitites
Chapter 17.60 Underground Wiring Districts
Chapter 17.64 Protection of City Owned Telecommunications Line and Equipment, Street Lighing and Traffic Signal Systems
Chapter 17.68 Street Lights
Chapter 17.72 (Repealed)
Chapter 17.76 Fuel Tanks
Chapter 17.80 Plats and Dedications
Chapter 17.82 Land Divisions
Chapter 17.84 Street Vacations
Chapter 17.88 Street Access
Chapter 17.92 Street Designation
Chapter 17.93 Renaming City Streets
Chapter 17.96 Surveys, Elevations and Monuments
Chapter 17.100 Remedies and Penalties
Chapter 17.102 Solid Waste & Recycling Collection
Chapter 17.103 Single-Use Plastic Checkout Bags