17.08.100 Completion of Construction.

(Amended by Ordinance No. 182760, effective June 5, 2009.)

 

A.  After the work financed by the local improvement district has been completed satisfactorily, the Responsible Engineer shall prepare a certificate of completion.  The Responsible Engineer shall also prepare a final engineer’s estimate showing the costs of all engineering and construction work performed.  The certificate of completion shall be deemed acceptance by the City of the local improvement work.

 

B.  Authorization for final payment will be made as provided by Chapter 5.33 of City Code.

 

C.  The Local Improvement District Administrator will include the final engineer’s estimate and a copy of the certificate of completion with the filing of the final assessment ordinance as set forth in Section 17.08.130.

 

D.  Notice of completion of the work need not be provided except as may be required  elsewhere in City Code.

 

E.  If a local improvement is substantially complete except for contract closeout, or if a scope of improvement included in the construction contract but not included in the local improvement is incomplete, the Responsible Engineer at the discretion of the Responsible Bureau may file a written report attesting that the local improvements are complete in lieu of a certificate of completion.  The provisions set forth in Section 17.08.100.A apply, except that the written report substitutes for the certificate of completion. Any further project or financing costs incurred subsequent to final assessment will be the responsibility of the Responsible Bureau, not of the property owners.


Title 17 Public Improveme
Chapter 17.04 Definitions
Chapter 17.06 Administration of Public Works Permitting
Chapter 17.08 Local Improvement Procedure
Chapter 17.12 Assessments
Chapter 17.13 Parks and Recreation System Development Charge
Chapter 17.14 Financing Systems Development Charges
Chapter 17.15 Transportation System Development Charge
Chapter 17.16 General Provisions
Chapter 17.18 General Obligation Improvement Warrants
Chapter 17.19 Northwest Transportation Fund
Chapter 17.20 (Repealed)
Chapter 17.23 Special Traffic Control District
Chapter 17.24 Permits
Chapter 17.25 Sidewalk Cafes
Chapter 17.26 Sidewalk Vendors
Chapter 17.27 Structural Driveways
Chapter 17.28 Sidewalks, Curbs and Driveways
Chapter 17.30 (Repealed)
Chapter 17.32 Public Sewer and Drainage System Permits, Connections and Maintenance
Chapter 17.33 Required Public Sewer Connection
Chapter 17.34 Sanitary Discharges
Chapter 17.35 Septage Discharge
Chapter 17.36 Sewer User Charges
Chapter 17.37 Downspout Disconnection
Chapter 17.38 Drainage and Water Quality
Chapter 17.39 Storm System Discharges
Chapter 17.40 Protection of Public Right-of-Way
Chapter 17.41 Landslide Abatement
Chapter 17.42 Property Owner Responsibility for Streets
Chapter 17.44 Street Obstructions
Chapter 17.45 Advertising on Bus Benches
Chapter 17.46 Newsracks
Chapter 17.48 Moving Buildings
Chapter 17.52 Trees
Chapter 17.56 Public Utilitites
Chapter 17.60 Underground Wiring Districts
Chapter 17.64 Protection of City Owned Telecommunications Line and Equipment, Street Lighing and Traffic Signal Systems
Chapter 17.68 Street Lights
Chapter 17.72 (Repealed)
Chapter 17.76 Fuel Tanks
Chapter 17.80 Plats and Dedications
Chapter 17.82 Land Divisions
Chapter 17.84 Street Vacations
Chapter 17.88 Street Access
Chapter 17.92 Street Designation
Chapter 17.93 Renaming City Streets
Chapter 17.96 Surveys, Elevations and Monuments
Chapter 17.100 Remedies and Penalties
Chapter 17.102 Solid Waste & Recycling Collection
Chapter 17.103 Single-Use Plastic Checkout Bags