10.50.030 City Inspections.

(Amended by Ordinance No. 179690, effective November 18, 2005.) The Director shall conduct the following inspections on permitted development activities. It shall be the duty of the responsible party to notify the Director at the appropriate inspection phase as set forth below. Inspections of erosion, sediment and pollutant control measures may occur with other inspections being conducted on the development or construction project.
 
A. Pre-construction inspection. The Director shall conduct inspections after initial, temporary erosion, sediment and pollutant control measures have been put in place and prior to any ground disturbance in addition to that necessary for the installation of the erosion, sediment and pollutant control measures. When the development is being conducted in phases, this inspection shall occur at the beginning of each phase.
 
B. Permanent measures inspection. The Director shall conduct inspections after permanent measures are put in place. When the development is being conducted in phases, this inspection shall occur after permanent measures have been installed for each phase.
 
C. Interim inspections. The Director may conduct other inspections not specifically addressed above to determine compliance with this Title.
 
D. Final erosion control inspection. For special sites as defined in Section 10.30.030 A., an inspection shall be conducted after construction completion to determine the effectiveness of permanent erosion and sediment control measures. This inspection shall be conducted six months after construction completion or at other times determined by the Director. This inspection may be conducted at sites other than special sites as determined by the Director.