(Amended by Ordinance No. 179690, effective November 18, 2005.)
A. All permit applications or contract submittals that
require an erosion, sediment, and pollutant control plan shall be accompanied by
the plans at the time of application or submittal. The number of erosion,
sediment and pollutant control plans required shall be determined by the
applicable permit or contract process. All erosion, sediment and pollutant
control plans shall comply with the Minimum Erosion, Sediment and Pollutant
Control Plan Standards in the Erosion Control Manual.
B. The Director shall review all erosion, sediment and
pollutant control plans. The Director may waive items required under Subsection
A above where the Director determines that certain items are not applicable to a
specific application or project.
C. The responsible party shall be accountable for any plan
modifications needed due to conflicts, omissions or changed conditions that
arise in the field. The responsible party shall bear all costs to comply with
the City of Portland Standard Construction Specifications, the Erosion Control
Manual and the City Code.
|
| |