PortlandOnline

POL Government Elected Officials Auditor Griffin-Valade Charter, Code & Policies City Code & Charter Online Code & Charter Title 24 Building Regulat Chapter 24.85 Seismic Design Requirements for Existing Buildings
24.85.070 Phasing of Improvements.

(Amended by Ordinance No. 178831, effective November 20, 2004.)
 
A. The Director may approve a multi-year phased program of seismic improvements when the improvements are pre-designed and an improvement/implementation plan is approved by the Director. The maximum total time allowed for completion of phased improvements shall be ten years. A legal agreement between the building owner and the City of Portland shall be formulated outlining the phased seismic improvements and shall be recorded with the property deed at the County.
 
B. Upon review, the Director may extend the maximum time for the phased improvements. The Director shall adopt rules under Section 3.30.035 describing the process for granting an extension.

Title 24 Building Regulat
Chapter 24.10 Administration and Enforcement
Chapter 24.15 Definitions
Chapter 24.20 Special Inspections
Chapter 24.25 Movings of Buildings
Chapter 24.30 Home Occupations
Chapter 24.35 Historical Buildings
Chapter 24.40 Use of and Projections Over Public Streets and Property
Chapter 24.45 Parking and Driveway Surfaces
Chapter 24.50 Flood Hazard Areas
Chapter 24.51 Wildfire Hazard Zones
Chapter 24.55 Building Demolition
Chapter 24.60 Fences
Chapter 24.65 Sidewalk Vault Openings
Chapter 24.70 Clearing, Grading and Erosion Control
Chapter 24.75 Uniform Building Address System
Chapter 24.80 (Repealed)
Chapter 24.85 Seismic Design Requirements for Existing Buildings
Chapter 24.90 Manufactured Dwelling Installation and Accessory Structures, Manufactured Dwelling Parks, Recreation Parks, Recreational Park Trailer Installation and Accessory Structures
Chapter 24.95 (Repealed)