A. It is
unlawful for any person to drive any piling or to dredge or dig within 200’ of
the submerged water mains of the City of Portland in the Willamette River, without first obtaining
written permission to do so from the Harbor Master. Before giving any such
permission, the Harbor Master shall consult with the Engineering staff of the
Portland Bureau of Water Works. The existing City water mains are located
as follows:
A 30-inch water main from the foot of SW Spokane
Street to the foot of SE Spokane
Street.
A 36-inch water main from the foot of SW Caruthers
Street to the foot of SE Stephens
Street.
A 24-inch water main from the foot of SW Mill
Street to the projected foot of SE Stephens
Street.
A 30-inch water main from the foot of SW Clay
Street to the foot of SE Clay
Street.
A 60-inch water main from the foot of SW Miles
Place to the foot of SE Lambert
Street.
A 36-inch water main from the foot of St.
Johns Bridge to the foot of N. Pittsburgh
Street (approx. 500 feet upstream of the center line of the St.
Johns Bridge).
The location of the City’s water mains are
indicated by large targets on which there is printed “Pipe Crossing City of
Portland.”
B. Nothing in the above Section shall relieve any person, company, or corporation from securing such other permits as may be required by any other agency such as, U.S. Army Corps of Engineers or the Port of Portland, and Division of State
Lands.
|
| |