PortlandOnline

POL Government Elected Officials Auditor Griffin-Valade Charter, Code & Policies City Code & Charter Online Code & Charter Title 26 Electrical Regul Chapter 26.03  Organization and Enforcement
26.03.110 Electrical Fences.

A.  Where Permitted.  Locations in industrial use categories as defined in Title 33 may have electrically charged fences if the installation meets the requirements of this Title.  Electrical fences and obstructions are prohibited at all other locations.
 
B.  Standards for Electrical Fences.  Electrical fences shall comply with the following standards:
1.  The product shall be listed by a State ofOregon approved testing laboratory. 
 
2.  The product shall be installed and used in accordance with the testing laboratory listing.
 
3.  Electrical permits and inspections shall be required for the installation.
 
4.  Warning signs which notify individuals of a dangerous fence shall be posted on the fence, at intervals not to exceed 50 feet.  The statement, DANGER - Electrified Fence, (or an equivalent statement) shall be on the warning signs.